Laundry Room Progress

Kristen has been working on getting things caulked, the nail holes filled and a first coat of paint on things. Because the wood on the wainscoting is a knotty pine we are putting on coat of a sealing primer before the trim paint. Here you can see some of the nail holes filled prior to sanding, priming and painting.
Here are the shelves removed and painted.
Here you can see some of the wainscoting with the first coat of paint on. We still need to get the joint compound up on the walls and the texture put on.

Next up is getting some wainscoting on the last wall. The first step is to cut out strips from the wall to create a nailing strip for the wainscoting. I used to cut things out like this with the utility knife, now I use a small circular saw with the depth set at 1/2", this makes a much cleaner and quicker cut.
 
Once the strip was removed it was replaced with 1/2" plywood that will act as the nailing surface for the smaller wainscoting panels. You can also see the first small piece of chair rail that is placed on the wall.
Here the baseboard and baseboard cap has been added as well as the wainscoting and chair rail on the last wall in the room.
Here is a view of the other end of the wall. The trim around the door has been started but there is still some work that needs to be done on the furnace side as well at the header at the top of the door. I will work to get the small trim pieces complete between the door trim and the wall before the weekend.

Sunday, January 6, 2013

Laundry Room Wainscoting, Baseboard and Trim

We started working on one of the walls putting wainscoting up around the room. First, a section of the drywall had to be cut out and a board added to have something to nail the bead board to at the top and bottom.
Then the chair rail and baseboard were added. One side of the door trim had to be up to fit it to.

Then the slats were added.
The holes were filled. We still need to caulk and sand before priming. You can see the return on the chair rail against the door frame.
 
The wall to the right is next up, you can see that we have done the small section of chair rail, but that is it. We should get this wall done this week sometime after work.
 

Monday, December 31, 2012

Laundry Room Construction Started

First up was ripping up the linoleum floor and 3/4" plywood subfloor. This will allow the new floor of 1/2" Hardieboard and 1/4" tile to line up with the grade of the floor in the kitchen.
Next up is framing the walls around the hot water heater. You can also see in this picture the space that will be shelves.
Around the washer and dryer there is framing to support the table top that will go over them. We are still using the old butcher block that Kristen cleaned up that is standing vertical in the picture.
And around the furnace. This is the trickiest one to maintain the correct space from the unit in spots but to also frame in access panels for two sides and the filter.
The light switch was moved from its current location beside the door to a new box on the corner. And the first bit of drywall is put up.
The chair rail was then installed on the new unit along with the first bead board wainscoting.
The front panel on the furnace wainscoting is removable. You can see in this picture installing the wainscoting on the removable panel.

Here it is after all of the wainscoting is installed around the furnace area. You can also see in this picture the location of the 4 bolts that hold on the front panel.
There will be a door for access to the filter panel. This door will also allow access to a large and deep storage area.
Most of the drywall is up and the trim around the shelves is in so time to put on some mud.
We'll wait for it to dry give it a sanding and put on another coat tomorrow.

Saturday, December 29, 2012

Back to work on the house...laundry room design


 After a couple of long weekends for work in Germany and doing other things around the holiday we have started to tackle the back laundry room. This is one of the first rooms that we worked on in the house but we did not have much a vision when we did it so it was never complete. Here are the plan views of what we are planning on doing. Basically there will be a wall built around the furnace and hotwater heater that will include a number of removable panels for access and shelves for storage.

The first picture shows the plan view of the room. You can see the door sweep of the door coming from the kitchen (the back door is not drawn in). You can see the wall that is built around the furnace (two blocks with the circle next to it) and the hotwater heater (double circle) between these to units is a set of shelves. We will keep the table overtop of the washer and dryer which you can see poking out just a little from under the table.
 
 Here is an elevation view taken as you look to the left after coming through the kitchen door. You can see the washer and dryer under the table on the back wall. The new light switch location is shown as well as the door that will access storage and the air handler filter.

Here is another elevation view looking at the door that comes in from the kitchen. You can see the shelves that are located between the hotwater heater and the furnace. At this point in drawing up the plans I decided to add some wainscoting so that I could hide some of the access panels.