Sunday, September 19, 2010

Downstairs Bathroom Plumbing


The tub was a challenge because it was such a tight fit. It was a process to move in place - pictures we may share later.
We bought beautiful older looking hardware - fitting of our very old bathtub.
Hooking up the sink
And we have water! The cabinet is yet to be built - there is a temporary plywood box for now.

1 comment:

  1. This room looks really great, guys! The tub hardware is perfect.

    ReplyDelete