Monday, April 11, 2011

Work Started on the Sink Cabinet

We started up work on the sink cabinet unit last weekend. The first step is removing the dishwasher from its current location. Capping the water line and drain below the floor and putting down flooring in the location where the freestanding cabinet will be beside the sink unit. This is what it looked like after pulling up the subfloor.
 This is what it looked like after cutting the hole a little larger (to match the plywood patch in the background). I think in this one the water line and drain have also been capped.
 And here it is once the patch is put in place.
New flooring is laid down.
The cabinet base, like the stove unit. Sits on a 2X4 platform that has been leveled. Here you can see most of the pieces cut for the base. The large hole to the right of the sink bumpout is for the dishwasher.

Here it is all put together and sitting in place. I will level it this week and start on the construction of the sink unit this coming weekend. Once that is in then the dishwasher should be able to go into its final location.

Here is a picture of what the whole unit will look like. The double drawer to the right of the sink is just a panel on the front of the dishwasher.

1 comment:

  1. T&K
    Closing in on the sink unit must feel good! Having all that light with your new windows must brighten the spirits! Looks great!

    :) M___________

    ReplyDelete