Thursday, February 16, 2012

Bathroom Progress

We had been without a toilet or sink for almost a month and decided that it was time to hooked them up again. First, the baseboard piece that goes behind the toilet had to be installed. To do this, we had to remove some of the tile around the bathtub. We left the baseboard piece long because we are not sure how the new tiles will fit. We will trim it to length once the shower tiling is complete.
 

 
 The toilet was set in place and hooked up. As you can see, the main baseboard is the only piece in place. The top and bottom portions will be easy to slide in and attach even with the toilet in the way.

 The wall by the sink is all painted and ready to go. We took down the light and cleaned it up then reinstalled the same one. We also hung the new mirror on the wall that will be over the sinks.

 