Tuesday, February 5, 2013
Laundry Room Progress
Work has slowly been progressing on the back laundry room. Trim was added around both of the doors.
All of the trim was given a coat of primer paint.
Blocks were installed around the room where the wall meet the ceiling to support the installation of the crown molding.
The existing back door had a dog door cut into it so we went through the trouble of putting in a new door. My first hopeful thought would be that I could hang the new doors on those hinges but of course I had to replace the whole frame. The new one has divided panes instead of the stained glass piece.
Paint was put on all of the closet parts before putting everything back in. You can also see that the crown molding has been put up.
A new trim piece was put up as a header on both of the doors. The tape is holding the endcaps in place while their glue sets. You can also see in this picture that we have been able to get some paint on the crown molding and the new back door.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment