We finished up all the stained glass pieces to install on the doors and sides of the cabinet. Then we moved it in place in the corner of the kitchen.
The shelves and drawers were made and painted.
Then we installed an outlet on the back side of the cabinet.
The top molding was put in place, as well as the glass sides and doors.
And we have a completed cabinet! It's nice to have some upper shelves to put dishes on.
WOW - it looks amazing! What a wonderful piece!
ReplyDelete