
This picture shows some of the fiberboard blocking that was placed on the dimensional beams to pad them out to the right width and height. The second beam will have the padding on both sides like this one but it will not have the padding on the bottom because it is 1" lower.

Although a 16 foot trim piece would have worked perfectly I decided to use two 8 foot pieces just because it would be easier for just me to put up. A 45 degree scarf joint is in the middle where they meet and should hide it well once it is sanded and painted.

In this picture the boxing around the beam is complete but all of the nail holes have to still be filled and the joint between the two eight foot sections sanded down. You can see the space at the top that will be covered by the crown molding once the ceiling is done getting sanded and painted.

Wow, what a lot of work!
ReplyDelete