The lattice on the patio was finished up over the weekend. The pavers around the post and at the far end of the patio were cut to fit.
The second piece of lattice was installed and the lattice frame was installed between the posts. The posts were also cut to height and capped.
A simple box planter was built for some clematis and jasmine that should climb the lattice quickly.
No comments:
Post a Comment