Saturday, June 30, 2012

More work on back pavers

 We worked some more on the pavers in the back area between the house and garage on Saturday. Where the pavers end and the grass begins a edger piece was installed.

The downspout from the garage roof was extended down below grade into a dug french drain and the pavers will be fitted around it. In addition the trim piece was put under the door.

The end of the bed is going to be curved and was marked out with chalk.

And here it is once it has been cut. The edge of the bed will have some pavers mounted sailor style once everything is complete.
  Now all of the pavers are in up against the garage. The only thing left is to place the trim piece on the garage between the door frame and the corner molding.


No comments:

Post a Comment